ROHN 25G Installation

These pictures show the preparation to the tower hole preparation.  This was part of the installation shortly before the 1 yard of concrete was poured.   The actual concrete pour was on July 5, 2002.

As of August 19, 2002, still only 20 feet of tower waves from that concrete tomb. 

On October 1, 2002, with the help of Harry, KC5TRB and Dave, KC5OIP, the last two sections went up.   Still no antennas on that but that is planned.  Soon, perhaps.